Message below from Millard Fillmore Suburban Hospital Administration:
The parking lot areas from the ED patient parking back through the lower aspect of the North lot will be milled and paved beginning Monday 8/24 and going through 8/26.
Monday 8/24- lower aspect of North lot including over by the dock will be milled and paved.
Tuesday 8/25- drive from ED patient parking all the way back to the start of the North lot to be milled. Traffic will still be able to get through as needed, especially ambulance traffic.
Wednesday 8/26- this area will be paved.
Again, traffic will be allowed through, especially ambulance traffic.
This project does include the ED loop and all ED patient parking. It does include the part of the drive that goes past the ambulance loop, but does NOT include the ambulance loop itself.
This should not affect ambulance access to the ED but more for awareness.